Learn about the ongoing 公共工程 and 设施 repair projects to county roads, right of ways and facilities from damage caused by Hurricane Ian.
Riverside Boat Ramp Replacement
Last Updated: 10/18/2024 Category: 公园和娱乐 当前阶段: 设计开发
作为CMP的一部分, 社区服务 is conducting structural assessments on all piers, 栈道, seawalls and boat ramps; through this assessment process it was bought to CS attention that Riverside Boat Ramp provides immediate safety concerns. During the site analysis the engineer determined the ramp could not be repaired in place; this project will be to design a replacement ramp that alleviates the safety issues.
Sheriff 政府 and Hardened 911 Facility
Last Updated: 10/18/2024 Category: 已缴纳的销售税 Category: 县设施 当前阶段: Planning and Project Approval
Current facility is on airport-owned land with lease term up for renewal in 2023. Current building is a metal building repaired from damage in Hurrican Charley which is still suseptible to hurrican damage. It is not functionally laid out for current needs or growth. It is not designed or constructed to the needs of a modern law enforcement agency. E 911 will be colocated in the same facility.Sheriff District 4 HQ, Training Facility and K9 Unit
Last Updated: 10/18/2024 Category: 县设施 Category: 已缴纳的销售税 当前阶段: 建设
建设 of a replacement District 4 Headquarters Facility with a training component and K9 kennel/training area replacing existing facilites. The district office will utilize the prototype layout from District 1. The training building area will be incorporated into a single facility. The facility will be constructed at the Airport 路 Annex site, replacing the existing Sheriff's Training, Supervisor of Election and old Transit Facility .Supervisor of Elections Warehouse
Last Updated: 10/18/2024 Category: 县设施 Category: 已缴纳的销售税 当前阶段: Planning and Project Approval
提供新的20,000 sqft +/- facility up to current code, meet needs of required climate controlledspace by the Supervisor of Elections. The facility shall include climate-controlled storage area for sensitive polling equipment and related supplies and support staff. Must be readily accessible and support staff needs for monitoring tabulation. Preferably house SOE administrative offices and serve public visitation in the same location. Includes 10,000 sqft for emergency managemnet and facilites.Last Updated: 10/17/2024 类别:人行道 Category: 已缴纳的销售税 当前阶段: 设计开发
The BCC has requested a sidewalk be designed and constructed on Atwater St. as part of the 2020 Sales Tax Extension.Caring Way and Brinson Avenue 人行道上
Last Updated: 10/17/2024 类别:人行道 当前阶段: 设计开发
Caring Way and Brinson Avenue 人行道上Last Updated: 10/17/2024 Category: 已缴纳的销售税 类别:人行道 当前阶段: 设计开发
The BCC has requested a sidewalk be designed and constructed on Cleveland as part of the 2020 Sales Tax Extension.