Rotonda Bridge #014113 - Hurricane Ian Damaged Bridge

Project Description

Bridge 014113 Rotonda Blvd over Rotonda River was severely damaged during Hurricane Ian and is closed to all traffic, both vehicular and pedestrian. This project is for the design of permanent repairs or replacement to restore the bridge to service.

Project Location

Rotonda Blvd. over Rotonda River - Bridge #014113

Latest Updates

Upcoming Project Activities - September 2024

The county hired an engineering firm to design either the repairs or reconstruction of the 014113 bridge. As a first step, the consultant conducted and submitted a feasibility study to determine the most cost-effective solution. This analysis and design process, which began July 7, 2023, includes permitting and coordination with all appropriate environmental and regulatory agencies, including FEMA, to develop plans and specifications for bidding.

We have received the feasibility study and are in discussions with FEMA to determine the appropriate scope of work (rehabilitate or completely remove and replace) based on all factors.

The best estimate at this time for the completion of the construction of the bridge is July 2025. We will provide updates here as information is provided to us thru the design process.

预算

阶段 成本
设计 $323,790

时间表

阶段 Estimated Start Date Forecast Completion Actual Completion
设计 Development 06/16/2023

Supporting Materials

Project 阶段
Planning and Project Approval

Last Updated
09/24/2024

Project Manager
Kelly Slaughter

Public Relations
Tracy Doherty
Email Public Relations

Sponsor Department
Public Works

设计 Engineer/Architect
KCI Engineers